To the central content area

Soil and groundwater pollution survey and verification plan for 108 years-Keelung

Absrtact
From the implementation date (January 30, 108) to November 11, 108, the overall plan execution progress reached 96.1%, and the projects were generally completed, and the progress was in line with expectations. Up to 100%, the highlights are as follows: Groundwater monitoring well Liudu Riverside Park (C00032) Trichloroethylene was lower than the monitoring standard in the first to third seasons, and exceeded the monitoring standard in the fourth quarter. Liudu Riverside Park 101 (C00033) Trichloroethylene in the first, second, and fourth seasons It was lower than the monitoring standard, and exceeded the control standard in the third quarter. The test results from 102 to 108 years showed that most of trichloroethylene exceeded the control standard in the dry season. In addition, the statistics of the accumulated rainfall 2 weeks before the sampling date were compared, and it was found to be obvious during 104 to 108 The less accumulated rainfall, the higher the concentration of trichloroethylene. It is recommended to continue monitoring and tracking, and compare and analyze with the groundwater monitoring wells in China Electronics' self-monitoring site. After inspection and internal function inspection of 29 monitoring wells, there was no abnormality in the overall results, and the Mingde gas station, Xingye Metal, Liudu Riverside Park in Qidu District, and the groundwater monitoring well in Taiwan Arakawa Chemical Industry Co. After completion of well condition evaluation, recompletion of wells and removal of foreign objects, the basic structure of the well pipe screen is complete, and the well pipe wall and well The sieve wall is fouled, the bottom of the well is slightly deposited, there is no foreign matter, and the overall backwater condition is good. 3 control and control sites: Quanyi gas station is currently improved by in-situ chemical method. Regular monitoring of soil TPH in March 108 still exceeds the control standard; Beining Road gas station, the current schedule is excavation and installation Equipment phase; Second plant of Liudu General Plant of China Electronics Co., Ltd., which is currently in the project contracting phase; The Keelung Operation Office of the Marketing Division-Shimen Oil Supply Service Center (Badu Reservoir Area) and the Keelung Operation Office of the Oil Product Marketing Division of Taiwan PetroChina Co., Ltd.-Keelung Oil Supply Service Center have now submitted plans for necessary measures. It is expected to be submitted to the 3rd earth-moving conference for review on November 21, 108; the above-mentioned site will be inspected once every 2 weeks, and there is no abnormal condition, all meet the scheduled progress, and the improvement work will be carried out according to the approved plan. Statistics on the application data of 29 operators in the jurisdiction within the past 3 years, and the pollution potential classification based on factors such as station age, reported data, or detection abnormalities. After preliminary classification and screening, the priority implementation list is Taiya Mingde Gas Station and Dongming Road. Stations, the test results have no FID exceeding 250ppmV for continuous consolidation of reporting materials and enhanced classification over the years. Based on the classification assessment and grasp of the pollution potential, inventory of underground storage tanks is conducted annually to improve management efficiency. Examination of 13 applications for suspension of business transferred from the letter issued by the Industrial Development and Development Office, and after checking all submission lists, 3 belong to the businesses of Articles 8 and 9 of the Soil Pollution Law. Soil assessment survey data. Although the inspection results are below the control standards after review, in order to further confirm whether they may be polluted, the soil was sampled 5 times. Heavy metals, volatile organic compounds (VOCS), and total petroleum hydrocarbons (TPH) ) Are below regulatory standards. The soil sampling results of Shimen Oil Supply Center were 31 times, and the groundwater samples were 23 times. The soil testing results were below BTEX and TPH, and the groundwater BTEX and TPH were both below the control standard. The soil sampling at Keelung Oil Supply Center was 14 times, and the groundwater sampling was 7 tests, soil test results A08 total petroleum hydrocarbons (TPH) 1,580mg / kg exceeded the control standard, groundwater was lower than the control standard; completed a new standard monitoring well and soil sampling in Shimen Oil Supply Center-Badu Reservoir Area 14 At times, soil C02 total petroleum hydrocarbons (TPH) 1,400mg / kg exceeded the control standard, and groundwater was lower than the control standard. It can be seen that although large tanks were surveyed and tested in the tank area, although TPH and BTEX were lower than the control standard, only 2 In the non-storage area, the soil TPH has been detected to exceed the regulatory standards. It is recommended that the non-storage area of ​​the Shimen Oil Supply Service Center be investigated in the future to grasp the pollution potential. In the 1 ~ 4 seasons of the Tianluo River sediment sampling results, the mercury and zinc of Caishaoqiao exceeded the upper limit of quality indicators; the mercury and zinc of Xianglong Bridge exceeded the upper limit of quality indicators; the mercury of Meihouqiao exceeded the upper limit of quality indicators; There are no factories in the vicinity and there is no significant difference with the baseline survey data. It is initially judged as a non-foreign pollution source. It is speculated that it is more likely that the No. 2 plant of Taifei Jilong, which was located upstream, was announced as a soil pollution control site (arsenic, copper , Lead, mercury exceeding the standard), may be caused by factors such as scouring or sedimentation, but the Tianyu River is not fishing and paddling. The human body has a low chance of directly contacting the sediment, and there is no health risk. Completed two regulations briefing sessions and attended a total of 104 participants. Through the statistical analysis of the questionnaire, the industry affirmed the handling of the briefing sessions. The number of participants within five years of this year has increased significantly, and institutions may retire or recruit new people Factors such as lack of experience in regulations or management are recommended. In addition to the continuous promotion of regulations, it is recommended to focus on practical management issues to strengthen the concept of independent management of business operators; education and training of business personnel and cross-county exchanges on business management It has practical benefits, and it is recommended to continue to handle it according to actual needs. In order to achieve the benefits of soil and groundwater advocacy and improve the performance of evaluation, 25 additional campus advocacy activities were handled to tell the school children the possible sources of pollution and the use of groundwater. The connection between life is connected, deepening the concept of protecting groundwater. The emergency response items include: confirming whether the groundwater of Keelung Oil Supply Service Center may be polluted, using emergency response to set up new simple wells, the test results show that the groundwater TPH is lower than the control standard, and the waste well operation is completed according to regulations; Dehe Elementary School and ZTE Elementary School Because the water level is too low to sample and construction problems, the waste well operation has been carried out. The above funds have been supported by NT $ 191,600, and the remaining amount is 8,400 yuan. They should be returned to the Environmental Protection Agency before the case is closed. As of November 7, 108, the online evaluation score was 89.5 points. Most of the items that have not been scored were due to systematic scoring. All relevant activities related to the correspondence with this department have been uploaded. At the end of the year, the score can be 23.5. Points (the original self-assessment weight was 20), and no points were deducted. This year, it has achieved good results in the assessment. The other 109 assessments focus on local characteristic operations and soil and water promotion business, including new storage facility management projects, mainly aimed at Comply with the Water Pollution Law business classification and handle the compliance check of laws and regulations with a view to complete the underground storage tank system.
Keyword
soil
Open
top